Browse IS/STAG - Portál UTB

Skip to page content
Website UTB
Portal title page UTB
Anonymous user Login Česky
Browse IS/STAG
Login Česky
  • Welcome
  • Browse IS/STAG
  • Applicant
  • Graduate
  • Web services
  • ECTS
  • User Info
Welcome
Browse IS/STAG
Information for applicantsElectronic applicationECTS arrivals
Getting startedAlumni ClubAbsolvent - website
Web services
ECTS
User Info

1st level navigation

  • Welcome
  • Browse IS/STAG
  • Applicant
  • Graduate
  • Web services
  • ECTS
  • User Info
User disconnected from the portal due to long time of inactivity.
Please, click this link to log back in.
(Sessions are disconnected after 240 minutes of inactivity. Note that mobile devices may get disconnected even sooner).

Prohlížení IS/STAG (S025)

Help

Main menu for Browse IS/STAG

  • Programmes and specializations.
  • Courses
  • Departments
  • Lecturers
  • Students
  • Examination dates
  • Timetable events
  • Theses, selected item
  • Pre-regist. study groups
  • Rooms
  • Rooms – all year
  • Free rooms – Semester
  • Free rooms – Year
  • Capstone project
  • Times overlap
  •  
  • Title page
  • Calendar
  • Help

Search for a Thesis

Print/export:  Bookmark this link in your browser so that you may quickly load this IS/STAG page in the future.
Only logged-in user will see student personal numbers.

Dates found, count: 1

Search result paging

Found 1 records Print Export to xls List URL
  Surname Name Title Thesis status   Supervisors Reviewers Type of thesis Date of def. Title
Student Type of thesis - - - - - - - - - -
Item shown in detail Grec Includes the selected person into the timetable overlap calculation. Marek The Design of the Production Line Equipment The Design of the Production Line Equipment Thesis finished and defended successfully (DUO).   Dvořák Zdeněk Maloch Jaroslav Master's thesis 1370210400000 03.06.2013 The Design of the Production Line Equipment Thesis finished and defended successfully (DUO).
Marek Grec Master's thesis 0XX 0XX 0XX 0XX 0XX 0XX 0XX 0XX 0XX 0XX

Thesis info Návrh konstrukce zařízení výrobní linky

  • Basic data
The document you are accessing is protected by copyright law. Unauthorised use may lead to criminal sanctions.
Name Grec Marek Includes the selected person into the timetable overlap calculation.
Acad. Yr. 2012/2013
Assigning department TUVI
Date of defence Jun 3, 2013
Type of thesis Master's thesis
Thesis status Thesis finished and defended successfully (DUO). Thesis finished and defended successfully (DUO).
Completeness of mandatory entries - The following mandatory fields are not filled in for this Thesis.: Title in English
Main topic Návrh konstrukce zařízení výrobní linky
Main topic in English The Design of the Production Line Equipment
Title according to student Návrh konstrukce zařízení výrobní linky
English title as given by the student -
Parallel name -
Subtitle -
Thesis supervisor Dvořák Zdeněk, doc. Ing. CSc.
External examiner Maloch Jaroslav, Ing. CSc.
Annotation Je nutné měnit dlouhodobě zavedené výrobní postupy a zastaralé výrobní technologie a nahrazovat je produktivnějšími metodami. Každá firma musí mít stanovenou podnikatel-skou strategii vedoucí k co nejvyšší produktivitě v požadované kvalitě a při co nejmenších nákladech, protože má smysl vyrábět jen to, co můžeme výhodně prodat.
Annotation in English It is necessary to change the established manufacturing processes and outdated manufacturing technology and replacing them with productive methods. Every company must have a set business strategy, leading to higher productivity in the required quality and at the least possible cost, because the meaning has only produce what we can sell for a profit.
Keywords automatizace, montáž, GRA páka, proces, tempomatová páka
Keywords in English automatization, assembly, GRA lever, process, speed control lever
Length of the covering note 71 s.
Language CZ
Annotation
Je nutné měnit dlouhodobě zavedené výrobní postupy a zastaralé výrobní technologie a nahrazovat je produktivnějšími metodami. Každá firma musí mít stanovenou podnikatel-skou strategii vedoucí k co nejvyšší produktivitě v požadované kvalitě a při co nejmenších nákladech, protože má smysl vyrábět jen to, co můžeme výhodně prodat.
Annotation in English
It is necessary to change the established manufacturing processes and outdated manufacturing technology and replacing them with productive methods. Every company must have a set business strategy, leading to higher productivity in the required quality and at the least possible cost, because the meaning has only produce what we can sell for a profit.
Keywords
automatizace, montáž, GRA páka, proces, tempomatová páka
Keywords in English
automatization, assembly, GRA lever, process, speed control lever
Research Plan 1. Úvod
2. Rozdělení výrobních procesů
3. Uspořádání pracovišť ve výrobním procesu
4. Montáž tempomatových pák
5. Optimalizace výrobního procesu
5. Návrh zařízení výrobní linky
6. Závěr
Research Plan
1. Úvod
2. Rozdělení výrobních procesů
3. Uspořádání pracovišť ve výrobním procesu
4. Montáž tempomatových pák
5. Optimalizace výrobního procesu
5. Návrh zařízení výrobní linky
6. Závěr
Recommended resources Automatizace a automatizační technika - Beneš, Janeček a kol
Řízení výrobního procesu - Rollo Jan, Tichák Jaroslav
Základy řízení výroby - Makovec Jaromír
Technické prostředky automatického řízení - Blátě a kol.
Úvod do studia metod průmyslového inženýrství a systémů služeb - Černý Jaromír
Recommended resources
Automatizace a automatizační technika - Beneš, Janeček a kol
Řízení výrobního procesu - Rollo Jan, Tichák Jaroslav
Základy řízení výroby - Makovec Jaromír
Technické prostředky automatického řízení - Blátě a kol.
Úvod do studia metod průmyslového inženýrství a systémů služeb - Černý Jaromír
Týká se praxe No
Enclosed appendices CD ROM, výkresy
Appendices bound in thesis illustrations, tables
Taken from the library No
Full text of the thesis
Appendices
Reviewer's report
Supervisor's report
Defence procedure record file