Browse IS/STAG - Portál UTB

Skip to page content
Website UTB
Portal title page UTB
Anonymous user Login Česky
Browse IS/STAG
Login Česky
  • Welcome
  • Browse IS/STAG
  • Applicant
  • Graduate
  • Web services
  • ECTS
  • User Info
Welcome
Browse IS/STAG
Information for applicantsElectronic applicationECTS arrivals
Getting startedAlumni ClubAbsolvent - website
Web services
ECTS
User Info

1st level navigation

  • Welcome
  • Browse IS/STAG
  • Applicant
  • Graduate
  • Web services
  • ECTS
  • User Info
User disconnected from the portal due to long time of inactivity.
Please, click this link to log back in.
(Sessions are disconnected after 240 minutes of inactivity. Note that mobile devices may get disconnected even sooner).

Prohlížení IS/STAG (S025)

Help

Main menu for Browse IS/STAG

  • Programmes and specializations.
  • Courses
  • Departments
  • Lecturers
  • Students
  • Examination dates
  • Timetable events
  • Theses, selected item
  • Pre-regist. study groups
  • Rooms
  • Rooms – all year
  • Free rooms – Semester
  • Free rooms – Year
  • Capstone project
  • Times overlap
  •  
  • Title page
  • Calendar
  • Help

Search for a Thesis

Print/export:  Bookmark this link in your browser so that you may quickly load this IS/STAG page in the future.
Only logged-in user will see student personal numbers.

Dates found, count: 1

Search result paging

Found 1 records Print Export to xls List URL
  Surname Name Title Thesis status   Supervisors Reviewers Type of thesis Date of def. Title
Student Type of thesis - - - - - - - - - -
Item shown in detail Hančík Includes the selected person into the timetable overlap calculation. Pavel Reconstruction of Wastewater Treatment Plant in Cheb Reconstruction of Wastewater Treatment Plant in Cheb Thesis finished and defended successfully (DUO).   Volek František Dvořák Zdeněk Bachelor's thesis 1346796000000 05.09.2012 Reconstruction of Wastewater Treatment Plant in Cheb Thesis finished and defended successfully (DUO).
Pavel Hančík Bachelor's thesis 0XX 0XX 0XX 0XX 0XX 0XX 0XX 0XX 0XX 0XX

Thesis info Rekonstrukce čistírny odpadních vod Cheb

  • Basic data
The document you are accessing is protected by copyright law. Unauthorised use may lead to criminal sanctions.
Name Hančík Pavel Includes the selected person into the timetable overlap calculation.
Acad. Yr. 2011/2012
Assigning department TUVI
Date of defence Sep 5, 2012
Type of thesis Bachelor's thesis
Thesis status Thesis finished and defended successfully (DUO). Thesis finished and defended successfully (DUO).
Completeness of mandatory entries - The following mandatory fields are not filled in for this Thesis.: Title in English
Main topic Rekonstrukce čistírny odpadních vod Cheb
Main topic in English Reconstruction of Wastewater Treatment Plant in Cheb
Title according to student Rekonstrukce čistírny odpadních vod Cheb
English title as given by the student -
Parallel name -
Subtitle -
Thesis supervisor Volek František, Ing. CSc.
External examiner Dvořák Zdeněk, doc. Ing. CSc.
Annotation Předkládaná bakalářská práce pojednává o popisu rekonstrukce městské čistírny odpadních vod v Chebu. Důvodem rekonstrukce byla zejména potřeba rozšíření kapacity a potřeba přizpůsobit se současné i připravované legislativě v České republice, která v souladu s direktivami Evropské unie nutí provozovatele čistíren odpadních vod připravovat a realizovat projekty intenzifikací čistíren odpadních vod. Hlavním požadavkem je odstraňování nejenom organického znečištění (BSK5), ale především znečištění tvořené formami dusíku a fosforu. V teoretické části se okrajově seznámíme s historií, současností, aktuálními problémy v čistírenství, druhy odpadních vod a zejména se stávajícími technologickými zařízeními na ČOV Cheb. V praktické části bude nastíněn návrh opatření ke splnění všech předepsaných parametrů, který následně bude rozepsán do konkrétní technologické podoby. Závěrem bude provedeno celkové ekonomické zhodnocení všech potřebných úprav.
Annotation in English This bachelor thesis deals with a reconstruction of a city wastewater treatment plant in Cheb. The main reason of this reconstruction was a need to extend a capacity and a need to comply with a contemporary and forthcoming legislation in the Czech Republic, which in accordance with directives of EU forces keepers of sewage plants to implement a wastewater treatment plant intensification projects. The main requirement is an elimination of organic pollution (BSK5) and especially nitrogen and phosphorus pollution. The theoretical part is focused on a history, the present, actual problems in sewage disposal, types of waste water and current technological equipments of sewage plant in Cheb. Practical part is focused on suggestions to fulfil all required parameters and theirs concrete technological description. The end of this thesis presents economical assessment of all required modifications.
Keywords rekonstrukce, intenzifikace, čistírna odpadních vod
Keywords in English reconstruction, intensification, wastewater treatment plant
Length of the covering note 77
Language CZ
Annotation
Předkládaná bakalářská práce pojednává o popisu rekonstrukce městské čistírny odpadních vod v Chebu. Důvodem rekonstrukce byla zejména potřeba rozšíření kapacity a potřeba přizpůsobit se současné i připravované legislativě v České republice, která v souladu s direktivami Evropské unie nutí provozovatele čistíren odpadních vod připravovat a realizovat projekty intenzifikací čistíren odpadních vod. Hlavním požadavkem je odstraňování nejenom organického znečištění (BSK5), ale především znečištění tvořené formami dusíku a fosforu. V teoretické části se okrajově seznámíme s historií, současností, aktuálními problémy v čistírenství, druhy odpadních vod a zejména se stávajícími technologickými zařízeními na ČOV Cheb. V praktické části bude nastíněn návrh opatření ke splnění všech předepsaných parametrů, který následně bude rozepsán do konkrétní technologické podoby. Závěrem bude provedeno celkové ekonomické zhodnocení všech potřebných úprav.
Annotation in English
This bachelor thesis deals with a reconstruction of a city wastewater treatment plant in Cheb. The main reason of this reconstruction was a need to extend a capacity and a need to comply with a contemporary and forthcoming legislation in the Czech Republic, which in accordance with directives of EU forces keepers of sewage plants to implement a wastewater treatment plant intensification projects. The main requirement is an elimination of organic pollution (BSK5) and especially nitrogen and phosphorus pollution. The theoretical part is focused on a history, the present, actual problems in sewage disposal, types of waste water and current technological equipments of sewage plant in Cheb. Practical part is focused on suggestions to fulfil all required parameters and theirs concrete technological description. The end of this thesis presents economical assessment of all required modifications.
Keywords
rekonstrukce, intenzifikace, čistírna odpadních vod
Keywords in English
reconstruction, intensification, wastewater treatment plant
Research Plan 1. Analýza současného stavu čistírny odpadních vod Cheb
2. Návrh opatření k dosažení stanovených parametrů
3. Technologické provedení úprav
4. Ekonomické zhodnocení
Research Plan
1. Analýza současného stavu čistírny odpadních vod Cheb
2. Návrh opatření k dosažení stanovených parametrů
3. Technologické provedení úprav
4. Ekonomické zhodnocení
Recommended resources Dle doporučení vedoucího práce Normy ČSN
Recommended resources
Dle doporučení vedoucího práce Normy ČSN
Týká se praxe No
Enclosed appendices -
Appendices bound in thesis schemes, tables
Taken from the library No
Full text of the thesis
Appendices
Reviewer's report
Supervisor's report
Defence procedure record file